• Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings
  • Metal Commercial Shop Mall Center Steel Buildings

Metal Commercial Shop Mall Center Steel Buildings

Metal commercial metal shop mall center steel buildings Pre-engineered shopping mall A mall is a steel work built over a structural concept of primary and secondary members, and roof sheeting connected to each other. The structural members are custom designed to be high in strength as well as...

Product Details

Metal commercial metal shop mall center steel buildings

Pre-engineered shopping mall

A mall is a steel work built over a structural concept of primary and secondary members, and roof sheeting connected to each other. The structural members are custom designed to be high in strength as well as lighter in weight.

At present Steel is the material of choice for all in construction, compared to concrete and timber. Thus structural construction designs have become more serviceable and adaptable. In future too the choice of mall building will have the same effect as on today. 

Primary Sections Column, Rafters

Secondary Sections Faspacer, Tie rods, Eave Strut, Rake angles, Girts

Cranes and  floor

Roofing Cladding and Wall cladding

Accessories Canopy, Turbo Vent, Ridge Vent, Gutters, Crane Runways,

Insulations, Louvers, Roof curb, Sealants, Fasteners etc

  

 

USE OF PEB

PEB concept has been very successful and well established in North America, Australia and is presently expanding in U.K and other European countries. PEB is ideal for construction in remote & hilly areas due to its low cost and fast completion. PEB concept has acted as a catalyst in the infrastructure development of the country.

The PEB rigid frame comprises of built-up members with tapered or straight columns and tapered rafters. The frame is erected by bolting the end plates of connecting sections together.

PEB steel structure shopping mall are fabricated to the end user's requirement in a factory and erected at site, which leads to saving of time.

PEB shopping mall is ideal for buildings in City Area where land cost is too high.

PEB steel structure mall building is ideal for buildings that are to be built faster.

  


FAQ

1. How to purchase your idea products?

A: TT and L/C are acceptable for us and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

2. How long for the delivery time?

A: It will according to the order quantities. Generally speaking, the delivery time will be within 15 to 40 days.

3. How to pack and loading the products?

A: We use standard package.

B: If you have special package requests, we will glad to pack as required, but the fees will be paid by customers.

4. How to install after the goods arriving construction site?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.


Packaging & Delivery

Packaging Details:

Packaging Details: Exported standard package or as customer's requirements

Delivery Detail: Within 30 days after deposit received for Pre-engineered mall

Delivery Detail:

Shipped in 30-40 days after payment


Related Products

Inquiry